• English
    • Ελληνικά
    • Deutsch
    • français
    • italiano
    • español
  • italiano 
    • English
    • Ελληνικά
    • Deutsch
    • français
    • italiano
    • español
  • Login
Mostra Item 
  •   DSpace Home
  • Επιστημονικές Δημοσιεύσεις Μελών ΠΘ (ΕΔΠΘ)
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ.
  • Mostra Item
  •   DSpace Home
  • Επιστημονικές Δημοσιεύσεις Μελών ΠΘ (ΕΔΠΘ)
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ.
  • Mostra Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
Tutto DSpace
  • Archivi & Collezioni
  • Data di pubblicazione
  • Autori
  • Titoli
  • Soggetti

Regulatory delays in a multinational clinical stroke trial

Thumbnail
Autore
de Jonge J.C., Reinink H., Colam B., Alpers I., Ciccone A., Csiba L., Kõrv J., Kurkowska-Jastrzebska I., Macleod M.R., Ntaios G., Thomalla G., Bath P.M., van der Worp H.B.
Data
2021
Language
en
DOI
10.1177/23969873211004845
Soggetto
Article
brain hemorrhage
brain ischemia
cerebrovascular accident
clinical trial (topic)
drug efficacy
familial hypercholesterolemia
human
major clinical study
multicenter study
outcome assessment
SAGE Publications Ltd
Mostra tutti i dati dell'item
Abstract
Introduction: The initiation and conduct of randomised clinical trials are complicated by multiple barriers, including delays in obtaining regulatory approvals. Quantitative data on the extent of the delays due to national or local review in randomised clinical trials is scarce. Materials and methods: We assessed the times needed to obtain regulatory approval and to initiate a trial site for an academic, EU-funded, phase III, randomised clinical trial of pharmacological prevention of complications in patients with acute stroke in over 80 sites in nine European countries. The primary outcome was the time from the first submission to a regulatory authority to initiation of a trial site. Secondary outcomes included time needed to complete each individual preparatory requirement and the number of patients recruited by each site in the first 6 and 12 months. Results: The median time from the first submission to a regulatory authority to initiation of a trial site was 784 days (IQR: 586–1102). The single most time-consuming step was the conclusion of a clinical trial agreement between the national coordinator and the trial site, which took a median of 194 days (IQR: 93–293). A longer time to site initiation was associated with a lower patient recruitment rate in the first six months after initiation (B = –0.002; p = 0.02). Discussion: Conclusion: In this EU-funded clinical trial, approximately 26 months were needed to initiate a trial site for patient recruitment. The conclusion of a contract with a trial site was the most time-consuming activity. To simplify and speed up the process, we suggest that the level of detail of contracts for academic trials should be proportional to the risks and commercial interests of these trials. © European Stroke Organisation 2021.
URI
http://hdl.handle.net/11615/73137
Collections
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ. [19735]
htmlmap 

 

Ricerca

Tutto DSpaceArchivi & CollezioniData di pubblicazioneAutoriTitoliSoggettiQuesta CollezioneData di pubblicazioneAutoriTitoliSoggetti

My Account

LoginRegistrazione
Help Contact
DepositionAboutHelpContattaci
Choose LanguageTutto DSpace
EnglishΕλληνικά
htmlmap