Logo
    • English
    • Ελληνικά
    • Deutsch
    • français
    • italiano
    • español
  • English 
    • English
    • Ελληνικά
    • Deutsch
    • français
    • italiano
    • español
  • Login
View Item 
  •   University of Thessaly Institutional Repository
  • Επιστημονικές Δημοσιεύσεις Μελών ΠΘ (ΕΔΠΘ)
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ.
  • View Item
  •   University of Thessaly Institutional Repository
  • Επιστημονικές Δημοσιεύσεις Μελών ΠΘ (ΕΔΠΘ)
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ.
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
Institutional repository
All of DSpace
  • Communities & Collections
  • By Issue Date
  • Authors
  • Titles
  • Subjects

Stochastic Simulation and Management of an Over-Exploited Aquifer Using an Integrated Modeling System

Thumbnail
Author
Sidiropoulos, P.; Mylopoulos, N.; Loukas, A.
Date
2015
DOI
10.1007/s11269-014-0852-3
Keyword
Overexploited aquifer
Uncertainty analysis
Stochastic
Integrated
simulation
Restoration
Water resources management
GROUNDWATER-FLOW
RESOURCES MANAGEMENT
UNCERTAINTY
OPTIMIZATION
REMEDIATION
FRAMEWORK
GREECE
Engineering, Civil
Water Resources
Metadata display
Abstract
A modeling system for the stochastic simulation and management of the overexploited groundwater resources of Lake Karla Basin in Central Greece is presented. The uncertainty of the hydrogeological environment which arises from the lack of the hydraulic conductivity data and aquifer's heterogeneity necessitates the stochastic simulation of the underlying aquifer. For the conditional stochastic simulation of hydraulic conductivity, the geostatistical approach was used generating Monte-Carlo realizations. The impact of Lake Karla (or reservoir) restoration and the accompanying projects on the aquifer, is examined through various management scenarios taking into consideration this parameter uncertainty. The target of the restoration plan is to rehabilitate aquifer's water table. This will be achieved through shutting down a great number of irrigation wells, as the irrigation needs of cultivations will be covered by the reservoir. The project with the highest environmental impact on the aquifer is the construction of 50 water supply wells at the lakeside zone of Lake Karla. Nowadays, due to the intense agricultural cultivation, the study area faces a serious water deficit problem, which has led to the over-exploitation of non-renewable groundwater and to a dramatic drawdown of aquifer's water table. The results of the stochastic simulation and management indicates that the operation of the new water supply wells will lead, despite the operation of the new reservoir, to a further drawdown of aquifer's water table, and will increase the effect of parameter uncertainty on hydraulic heads estimation by groundwater model.
URI
http://hdl.handle.net/11615/33007
Collections
  • Δημοσιεύσεις σε περιοδικά, συνέδρια, κεφάλαια βιβλίων κλπ. [19735]
htmlmap 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister (MyDspace)
Help Contact
DepositionAboutHelpContact Us
Choose LanguageAll of DSpace
EnglishΕλληνικά
htmlmap