Mostrar el registro sencillo del ítem
Overbreak risk assessment in the Athens metro TBM tunnels
dc.creator | Costopoulos, S. D. | en |
dc.date.accessioned | 2015-11-23T10:24:52Z | |
dc.date.available | 2015-11-23T10:24:52Z | |
dc.date.issued | 2004 | |
dc.identifier.issn | 8950563 | |
dc.identifier.uri | http://hdl.handle.net/11615/26768 | |
dc.description.abstract | Assessment of IBM tunneling conditions and potential for damage in building and archaeological remains is of greatest benefit in resolving problems associated with the construction of the Athens Metro, Greece. In this predictive philosoply an over-break risk assessment method was developed based on intuitive simplicity, theoretical background and past experience. The method evaluates ground conditions from boreholes and defines risk on the basis of hazard severity and likelihood of occurrence. As the method proved macroscopically efficient, research on the subject is on-going with evaluation of monitoring data gathered during construction and back analyses using numerical techniques. | en |
dc.source.uri | http://www.scopus.com/inward/record.url?eid=2-s2.0-10944269774&partnerID=40&md5=98f60f6a70c0589a08f6c6bcb1a371c1 | |
dc.subject | Boreholes | en |
dc.subject | Buildings | en |
dc.subject | Earth boring machines | en |
dc.subject | Grouting | en |
dc.subject | Numerical methods | en |
dc.subject | Risk assessment | en |
dc.subject | Rocks | en |
dc.subject | Structural design | en |
dc.subject | Ground movements | en |
dc.subject | Rock mass | en |
dc.subject | Tunnel boring machines (TBM) | en |
dc.subject | Tunnel construction | en |
dc.subject | Tunneling (excavation) | en |
dc.title | Overbreak risk assessment in the Athens metro TBM tunnels | en |
dc.type | conferenceItem | en |
Ficheros en el ítem
Ficheros | Tamaño | Formato | Ver |
---|---|---|---|
No hay ficheros asociados a este ítem. |