Εμφάνιση απλής εγγραφής

dc.creatorAndrianesis, P.en
dc.creatorLiberopoulos, G.en
dc.creatorBiskas, P.en
dc.creatorBakirtzis, A.en
dc.date.accessioned2015-11-23T10:22:21Z
dc.date.available2015-11-23T10:22:21Z
dc.date.issued2011
dc.identifier10.1109/EEM.2011.5953055
dc.identifier.isbn9781612842844
dc.identifier.urihttp://hdl.handle.net/11615/25602
dc.description.abstractWe consider a mandatory pool, based to the one established in the Greek electricity market, in which the unit commitment and the scheduling of energy and reserves are the solution of Day-Ahead Scheduling (DAS), an optimization problem that is solved daily and aims to minimize the system cost for the next day. The single-day horizon of DAS may be rather short for capturing the effects of the long start-up times and large commitment costs of slow-start lignite units; hence, the DAS solution may be myopic, resulting in higher total costs in the long-run. To tackle this problem, the Greek market uses a heuristic approach, in which the units' shut-down costs are replaced by their start-up costs and the start-up costs are suppressed; this facilitates the start-up and discourages the shutdown of slow-start units. To address and evaluate the myopic solution issue of DAS more rigorously, we extend the unit commitment problem to a longer horizon of several days, and keep only the solution for the next day as binding (rolling horizon). We call the resulting approach Medium-Term Unit Commitment (MTUC). We compare the long-run average performance of the MTUC output for different horizon lengths (2, 4 and 7 days) to that of the heuristic DAS approach used in the Greek market. The results show that MTUC brings in a small reduction in the total system cost. © 2011 IEEE.en
dc.source.urihttp://www.scopus.com/inward/record.url?eid=2-s2.0-80052136729&partnerID=40&md5=27b3996d2347fc33127c23bee2ef69ad
dc.subjectDay-ahead schedulingen
dc.subjectElectricity marketen
dc.subjectHeuristic approachen
dc.subjectOptimization problemsen
dc.subjectPool marketsen
dc.subjectRolling horizonen
dc.subjectSlow-starten
dc.subjectSmall reductionen
dc.subjectStart-up costsen
dc.subjectStart-upsen
dc.subjectSystem costsen
dc.subjectTotal costsen
dc.subjectUnit commitment problemen
dc.subjectUnit commitmentsen
dc.subjectCostsen
dc.subjectHeuristic methodsen
dc.subjectLakesen
dc.subjectSchedulingen
dc.subjectCommerceen
dc.titleMedium-Term Unit Commitment in a pool marketen
dc.typeconferenceItemen


Αρχεία σε αυτό το τεκμήριο

ΑρχείαΜέγεθοςΤύποςΠροβολή

Δεν υπάρχουν αρχεία που να σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στις ακόλουθες συλλογές

Εμφάνιση απλής εγγραφής